某高级中学建设项目环境影响评价研究
来源:wenku163.com 资料编号:WK1638061 资料等级:★★★★★ %E8%B5%84%E6%96%99%E7%BC%96%E5%8F%B7%EF%BC%9AWK1638061
资料介绍
某高级中学建设项目环境影响评价研究(21000字)
摘 要:任何一个建设项目,在施工期和运营期都会对项目进行预测和评估,从而避免开发建设周围的环境产生一定的影响。某高级中学位于某市某大道附近,本研究主 要是对项目进行工程分析并对项目的水环境、大气环境、声环境和固体废弃物的产生作出环境影响评价分析,在开发行动之前对项目进行预测和评估,提出预防或者 减轻不良环境影响的对策和措施,达到社会、环境和经济效益的统一。
关键词:环境影响评价;建设项目;水环境;大气环境
Research on Environmental Impact Assessment of A Senior Middle School Construction Project
Abstract: Every construction project will be forecasted and evaluated during the construction period and operation period in order to avoid the adverse effects to the surrounding environment caused by the development and construction. The senior middle school is located near one road, the project analysis and environmental impact analysis were studied in this EIA, and the water environment, air environment, noise and solid wastes impact assessment were also studied. The environmental impact assessment is aimed at assessment and prediction before the project, so as to give some suggestions to mitigate possible adverse effects to the environment, to integrate the development of social, environmental and economic benefits.
Key words: Environmental impact assessment; Construction project; Water environment; Atmosphere environment
目 录
摘 要 1
关键词 1
1 前言 2
2 项目概况 3
3 建设项目工程分析 4
3.1 工艺流程简介 4
3.1.1 施工期工艺流程 4
3.1.2 营运期工艺流程 5
3.2 主要污染情况简介 5
3.2.1 施工过程中主要污染情况 5
3.2.2 营运过程中的主要污染物 6
4 环境影响分析 6
4.1 施工期环境影响分析 6
4.1.1 水环境影响分析 6
4.1.2 水土流失影响分析 7
4.1.3 大气环境影响分析 7
4.1.4 噪声环境影响分析 9
4.1.5 固体废物环境影响分析 9
4.1.6 生态环境影响分析 10
4.1.7 施工期监督管理方案 11
4.1.8 施工期保护措施 11
4.2 营运期环境影响分析 12
4.2.1 水环境影响分析 12
4.2.2 大气环境影响分析 15
4.2.3 噪声环境影响分析 16
4.2.4 固体废物环境影响分析 16
4.2.5 实验室对环境的影响分析 17
4.2.6 外环境对本项目的影响分析 18
4.2.7 产业政策符合性、选址合理性分析 19
4.2.8 平面布置合理性分析 19
4.2.9 景观影响分析 20
4.2.10 “三同时”验收、环保投资 21
5 结论与建议 22
5.1 环境影响分析结论 22
5.1.1 施工期环境影响分析结论 22
5.1.2 营运期环境影响分析结论 24
5.1.3 达标排放 25
5.2 产业政策、选址合理性分析结论 25
5.3 建议 26
参考文献 26
致 谢 28
|