池黔公路扩建工程施工组织设计(附cad图纸)(含选题审批表,任务书,开题报告,中期检查报告,毕业论文19000字,cad图纸4张,excel表)
摘 要:根据合同要求,应对激烈的市场竞争, 结合实际情况,编制实施性施工组织设计,制定合理的施工计划,安排施工顺序及工期;建立文明安全施工领导组织,组成以项目经理为首的分级负责的安全生产体系,保障安全,文明施工。
关键词:施工部署;施工方案;进度;质量目标;安全文明施工
The organization design of the Highway of ChiQian expansion project
Abstract:According to the contract requirements, the paper should deal with the fierce competition of market by combining with the actual situation,implementing practical connstruction design, formulating a resonable construction schedule and arranging the sequence and duration of work. Establishing a civilized and safe constructive team which is composed of a Project manager responsible for the leveled security system could guarantee the safety civilized construction.
Keywords: Construction deployment; Construction plan; Progress; Quality goal; Safe and Civilized construction
工程概况:
池 黔公路改建工程,大致是将池黔原公路扩建至省一级公路,扩宽路面达16米,由原来的单行道改建成双行道,顺接怀化城市快速干道,起于与怀化池回,途经中 方.隆回.池田.鸡公界,在K5+100-K6+300处为中方老县城,存在改建事务,拆迁工作较艰巨,在K10+159.处设互通式十字路口,终点顺接 黔城,路线全长12.76Km。主要控制点为GPS做主控制,起大概圈定区域作用,全站仪进行进一步精确。主要河流:本项目上跨沅水流域,是属于长江流域 体系,舞水河洪水位是本项目的主要控制高程影响因素之一。 部分场地区原为稻田,属于冲织地貌,地势平坦,场地区地质自上而下主要为淤泥质压粘土,粉砂,粉细砂,土质疏松。
目 录
摘要…………………………………………………………………………………………1
关键词………………………………………………………………………………………1
1前言…………………………………………………………………………………………1
2池黔公路扩建工程概况……………………………………………………………………1
2.1扩建工程概况………………………………………………………………………1
2.1.1工程概况……………………………………………………………………1
2.1.2技术指标……………………………………………………………………1
2.1.3地形地貌……………………………………………………………………1
2.1.4区域地质……………………………………………………………………1
2.1.5水文与气候…………………………………………………………………2
2.1.6主要工程量…………………………………………………………………2
2.1.7施工准备……………………………………………………………………2
2.2施工作业及技术要求………………………………………………………………2
2.2.1基础开挖……………………………………………………………………2
2.2.2排石挤淤及质量要求………………………………………………………3
2.2.3挡土墙及质量要求…………………………………………………………3
2.2.4路基施工基本要求…………………………………………………………4
2.2.5涵洞工程……………………………………………………………………4
2.2.6钢筋混泥土圆管涵…………………………………………………………6
2.3排水工程及防护工程………………………………………………………………7
2.3.1边沟…………………………………………………………………………7
2.3.2截水沟………………………………………………………………………8
2.3.3铺草皮………………………………………………………………………8
2.3.5浆砌片石工程防护………………………………………………………9
3进度计划…………………………………………………………………………………9
3.1施工计划…………………………………………………………………………9
3.1.1进度计划…………………………………………………………………9
3.1.2工期保证措施……………………………………………………………10
3.1.3四月假定施工计划数据…………………………………………………11
3.1.4水准点坐标………………………………………………………………12
4 施工组织机构……………………………………………………………………………13
4.1项目组织机构规划………………………………………………………………13
4.1.1关键职位职责……………………………………………………………13
4.2规划一览表………………………………………………………………………16
4.3善后服务…………………………………………………………………………17
5关键技术交底……………………………………………………………………………17
5.1小型空气吸泥技术………………………………………………………………17
5.1.1土质分析…………………………………………………………………17
5.1.2空气吸泥原理……………………………………………………………17
5.1.3主要机械及施工准备……………………………………………………17
5.1.4吸泥操作要点……………………………………………………………18
5.1.5施工测量…………………………………………………………………18
5.2碎石桩及技术交底………………………………………………………………19
5.2.1碎石桩控制区域…………………………………………………………19
5.2.2施工准备…………………………………………………………………19
5.2.3人员、机械的投入计划……………………………………………………19
5.2.4 施工方案及施工工艺……………………………………………………20
5.2.5工程质量、工期、安全及环保措施………………………………………21
6成本规划…………………………………………………………………………………23
6.1细部成本及人员规划……………………………………………………………23
6.2成本管理措施………………………………………………………………24
7文明施工条例……………………………………………………………………………25
7.1文明施工条例……………………………………………………………………25
7.2环境保护措施……………………………………………………………………26
8质量保证体系……………………………………………………………………………27
8.1.1质量自检体系……………………………………………………………28
8.1.2质量保证体系……………………………………………………………28
9 结论………………………………………………………………………………………29
参考文献……………………………………………………………………………………29
致谢…………………………………………………………………………………………30
附录…………………………………………………………………………………………30
|